PROJECT TYPE: Poultry – 400,000 Bird Broiler Unit
DIMENSIONS: 109.730m (360′) Long x 24.400m (80′) Wide Buildings
DESCRIPTION: 8 No. Clear-Span Steel Framed Buildings with Individual Biosecurity Rooms and Catching Canopies with Curtains
LOCATION: Herefordshire
TOTAL PROJECT VALUE: £1,680,000.00 exc. VAT
BUILD DURATION: 20 Weeks for 5 Buildings. 12 Weeks for Additional 3 Buildings
KEY FEATURES:
– Eight large clear-span steel-framed broiler houses arranged in a an efficient layout
– Integrated biosecurity and catching facilities
– Steel cladding inside and out with 300mm roof insulation and 150mm wall insulation
– Insulated window shutters operated on a rack and pinion system
– Colour coded fan canopies
Project Overview
This project comprises eight clear-span steel-framed broiler houses, each measuring 109.73m (360′) in length by 24.4m (80′) in width. The buildings are arranged in a neat, efficient layout, with feed bins positioned to maximise space alongside the catching canopies.
Design & Construction
Each house is equipped with dedicated biosecurity rooms and catching canopies complete with curtain systems. Externally, the buildings feature a distinctive curved eaves detail. High‑specification double‑glazed uPVC windows provide natural daylight, with insulated composite shut‑off doors operated on a rack and pinion system for enhanced thermal performance.
The structures are steel clad inside and out, with 300mm roof insulation and 150mm wall insulation to optimise energy efficiency and environmental control. Our simple, colour-coded fan canopies—fabricated inhouse—continue to be a popular choice, offering reliable protection against adverse weather.‑clad inside and out, with 300mm roof insulation and 150mm wall insulation to optimise energy efficiency and environmental control. Our simple, colour‑coded fan canopies—fabricated in‑house—continue to be a popular choice, offering reliable protection against adverse weather.
Ventilation is delivered through sidewall air inlets and roof mounted extraction fans, supported by additional large end extraction units. All ventilation equipment was supplied by a third party and professionally installed by Jaques Int Ltd.‑wall air inlets and roof‑mounted extraction fans, supported by additional large end‑extraction units. All ventilation equipment was supplied by a third party and professionally installed by Jaques Int Ltd.
Groundwork: Connop & Son
Ventilation: JF Mckenna Ltd
Electrics: Securcom Systems Limited
Heating: CE Mechanical Services
Feeders: Roxell